Connect with us

US NATIONAL NEWS

AP: COVID Relief Bill Could Permanently Alter Social Safety Net

Published

on

In this March 10, 2021, photo, Speaker of the House Nancy Pelosi, D-Calif., gestures after the $1.9 trillion COVID-19 relief bill was passed at the Capitol in Washington. Biden’s $1.9 trillion COVID-19 relief package is being hailed by Democrats and progressive policy advocates as a generational expansion of the social safety net, providing food and housing assistance, greater access to health care and direct aid to families in what amounts to a broad-based attack on the cycle of poverty. (AP Photo/J. Scott Applewhite, File)

WASHINGTON (AP) — President Joe Biden’s $1.9 trillion COVID-19 relief package is being hailed by Democrats and progressive policy advocates as a generational expansion of the social safety net, providing food and housing assistance, greater access to health care and direct aid to families in what amounts to a broad-based attack on the cycle of poverty.

With more than $6 billion for food security-related programs, more than $25 billion in emergency rental assistance, nearly $10 billion in emergency mortgage aid for homeowners, and extensions of already-expanded unemployment payments through early September, the package is full of provisions designed to help families and individuals survive and recover from pandemic-induced economic hardships.

“When you stand back and look at it, that’s when you really can appreciate the sheer scope of it,” said Ellen Vollinger, legal director for the Food Research & Action Center, a food-security advocacy group. “The scope is both impressive and much needed.”

Several aspects seem targeted at restructuring the country’s social safety net and actually lifting people out of poverty. It’s the kind of ambition and somewhat old school Democratic Party ideal that has observers referencing former President Franklin Delano Roosevelt and the New Deal.

“We haven’t seen a shift like this seen since FDR. It’s saying families are too big to fail, children are too big to fail, the elderly are too big to fail,” said Andre Perry, senior fellow in the Metropolitan Policy Program at the Brookings Institution. “It’s a recognition that the social safety net is not working and was not working prior to the pandemic.”

Biden himself, when signing the package into law Thursday, referenced it as an overt attempt to redraw the country’s economic fault lines in a way that’s bigger than the pandemic. “This historic legislation is about rebuilding the backbone of this country and giving people in this nation, working people and middle-class folks, the people who built the country — a fighting chance,” Biden said.

And House Speaker Nancy Pelosi, D-Calif., called it “one of the most transformative and historic bills any of us will ever have the opportunity to support.”

Perry in particular pointed to the expansion of the child tax credit system as a potentially foundational change. The legislation provides families with up to $3,600 this year for each child and also expands the credit to millions of families currently making too little to qualify for the full benefits.

“That is really going to put a dent in child poverty,” Perry said.

In promoting the child tax credit expansion, Democrats rallied around an analysis that predicted it would cut nationwide child poverty by 45%.

The legislation extends through September last year’s 15% increase in benefits offered by the Supplemental Nutrition Assistance Program (SNAP) program, commonly known as food stamps. It also provides extra funds to administer the expanded SNAP program and to expand access to SNAP online purchasing.

The package also includes what amounts to the biggest expansion of federal help for health insurance since the Obama-era Affordable Care Act more than 10 years ago. Several million people could see their health insurance costs reduced, and there’s also an incentive for states to expand Medicaid coverage, if they haven’t already done so.

Those changes, however, won’t be as immediate as the direct cash injections in other areas.

Housing advocates give generally positive reviews, saying the massive relief packages for both renters and home owners should be enough to stave off the debts incurred so far. “This is an appropriate response for an unprecedented time. Clearly there’s a tremendous need to avoid an eviction tsunami,” said Diane Yentel, president of the National Low Income Housing Coalition.

But she also warned that the economic hardships, and need for assistance, will extend past the end of the pandemic.

“Many of the jobs that low-income workers have lost won’t come back right away,” she said.

Yentel called on Biden to extend the national moratorium on evictions via executive order. The current moratorium, imposed by the Centers for Disease Control as part of the national health emergency, is being challenged in multiple court cases and expires at the end of March.

Many of the legislation’s changes are temporary, but advocates and Democratic legislators are talking openly about making some of them permanent.

“Getting something out of the code is often times harder than getting something into the code,” House Ways and Means Committee Chairman Richard Neal, D-Mass., told reporters Tuesday, referring to the relief bill’s expansion of the child tax credit.

He added, “What we did is unlikely to go away.”

At this point, the child tax credit expansion would expire at the end of the year without some sort of congressional intervention. But permanently enshrining those changes into law could be a battle. Congress’ nonpartisan Joint Committee on Taxation has estimated the child tax credit’s cost at $110 billion, making it one of the single most expensive items in the whole package. Extending that over multiple years would be extremely costly, and would likely draw serious opposition, especially from Republicans.

Senate Minority Leader Mitch McConnell, R-Ky, called Democrats’ expansion of those credits “sweeping new government benefits with no work requirements whatsoever,” suggesting the shape of the GOP opposition strategy ahead. But the provision is projected to lift millions of families out of poverty, and progressives believe there will be tremendous pressure on Republicans to allow the change.

Many also want to preserve the bill’s temporarily beefed up earned income tax credit, and its improved tax breaks for caring for children and dependents and for paid sick and family leave.

A study by the Tax Policy Center concluded that the relief package would reduce federal taxes in 2021 by an average of $3,000 per household. Low- and moderate-income households (making $91,000 or less) would receive nearly 70 percent of the tax benefits, the study concluded.

“The question will be do they want child poverty to go back up again” by letting that credit expire, said Steve Wamhoff, director of federal tax policy for the liberal Institute on Taxation and Economic Policy.

___

Associated Press writer Josh Boak contributed to this report.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Sports

GM Brands Dominate Detroit as Cadillac and Corvette Capture IMSA Chevrolet Detroit Sports Car Classic Wins

Published

on

DETROIT (FNN SPORTS) — Cadillac and Chevrolet celebrated a historic hometown sweep Saturday as both General Motors brands captured class victories in the IMSA WeatherTech SportsCar Championship’s Chevrolet Detroit Sports Car Classic.

Competing in the shadow of General Motors’ Renaissance Center headquarters along the Detroit Riverwalk, the No. 31 Cadillac Whelen Cadillac V-Series.R driven by Jack Aitken and Earl Bamber dominated the 100-minute race to secure the overall victory and Grand Touring Prototype (GTP) class win.

In Grand Touring Daytona Pro (GTD PRO), Antonio Garcia and Alexander Sims powered the No. 3 Corvette Racing by Pratt Miller Motorsports Corvette Z06 GT3.R to victory, giving Chevrolet a celebrated win on its home turf.

Cadillac Continues Detroit Dominance

The No. 31 Cadillac controlled the race from start to finish, executing a near-flawless performance in front of General Motors executives, employees, and supporters.

The victory marked Cadillac’s fifth IMSA triumph in Detroit, adding to previous wins in 2017, 2018, 2021, and 2022. The result also extended the No. 31 team’s streak to seven consecutive GTP podium finishes.

“To do it here at the home of GM and Cadillac with so many friends and family with us, my team absolutely nailed it,” Aitken said after the race.

The No. 25 BMW M Team WRT BMW M Hybrid V8 finished second in class, while the No. 10 Cadillac Wayne Taylor Racing Cadillac V-Series.R completed the GTP podium.

Meanwhile, the No. 93 Acura Meyer Shank Racing with Curb Agajanian Acura ARX-06 earned the IMSA Michelin Sustainability in Racing Award with its fourth-place finish.

Corvette Capitalizes on Late-Race Drama

While Cadillac’s victory was largely under control, the GTD PRO race featured significant late-race drama.

Garcia nearly lost the lead when Jack Hawksworth attempted a pass entering Turn 1 in the No. 14 Vasser Sullivan Racing Lexus RC F GT3. Contact between the two cars triggered a penalty against Hawksworth, whose Lexus received a drive-through penalty for incident responsibility.

Despite the pressure, Garcia maintained control on the final restart to secure his first IMSA victory in Detroit and the 32nd IMSA win of his career.

“Super happy to be in victory lane in Chevrolet land,” Garcia said. “I think all the big bosses will be very happy, as we are. It was a fantastic drive by Alex, who put the car on pole and opened a big gap early.”

The late-race chaos opened the door for the No. 9 Pfaff Motorsports Lamborghini Temerario GT3 driven by Andrea Caldarelli and Sandy Mitchell to earn the new car’s first podium finish in second place.

The No. 65 Ford Mustang GT3 driven by Christopher Mies and Frederic Vervisch rounded out the GTD PRO podium in third.

Championship Battle Tightens Heading to Watkins Glen

Both class winners started from the Motul Pole Award position and successfully converted pole into victory despite two late caution periods that reshuffled the field and intensified competition during the closing laps.

The victory unofficially moves Aitken into the lead of the GTP championship standings, while the No. 4 Corvette pairing of Nicky Catsburg and Tommy Milner maintains the GTD PRO points lead, though by a reduced margin.

The IMSA WeatherTech SportsCar Championship returns June 28 for the Sahlen’s Six Hours of The Glen at Watkins Glen International, one of the premier endurance races on the North American sports car calendar.

Continue Reading

Tech

NASA Rolls Out Massive SLS Rocket Stage for Artemis III Mission to Kennedy Space Center

Published

on

Pictured above is the top four-fifths of the SLS (Space Launch System) core stage – the section containing the liquid hydrogen tank, liquid oxygen tank, intertank, and forward skirt. NASA will roll the largest section of the agency’s SLS rocket that will launch the second crewed Artemis mission under the Artemis III mission out of NASA’s Michoud Assembly Facility on Monday, April 20. Credit: NASA

NEW ORLEANS (FNN) — NASA will roll out the largest section of its Space Launch System rocket on Monday, April 20, marking a major milestone for the Artemis III mission.

The section, representing the top four-fifths of the SLS core stage, is being moved from NASA’s Michoud Assembly Facility in New Orleans. It includes the liquid hydrogen tank, liquid oxygen tank, intertank and forward skirt. The structure will be loaded onto NASA’s Pegasus barge for transport to Kennedy Space Center in Florida.

CORE STAGE DELIVERY AND INTEGRATION

Once the core stage arrives at Kennedy Space Center, teams will complete final outfitting and vertical integration. The hardware will then be transferred to NASA’s Exploration Ground Systems Program for stacking and launch preparation.

The Artemis III engine section and boat-tail, which protects the engines during launch, were previously moved to the Vehicle Assembly Building in July 2025. The four RS-25 engines are scheduled to arrive from Stennis Space Center in Mississippi no later than July 2026 for integration.

POWERING THE ARTEMIS III MISSION

Equipped with four RS-25 engines, the SLS core stage will generate more than 2 million pounds of thrust, enabling the launch of astronauts aboard the Orion spacecraft.

Artemis III is currently targeted for launch in 2027, following the successful Artemis II mission, which completed a crewed flight around the Moon on April 10.

NASA’S MOON-TO-MARS STRATEGY

The Artemis III mission is part of NASA’s broader Artemis program, aimed at returning astronauts to the Moon and establishing a sustained human presence.

The mission will test critical capabilities, including rendezvous and docking between the Orion spacecraft and commercial systems needed for future lunar landings, currently planned for 2028.

NASA is working in partnership with Boeing, the SLS core stage lead contractor, and L3Harris Technologies, the lead contractor for the RS-25 engines. The core stage remains the backbone of the SLS rocket and is manufactured at the Michoud Assembly Facilit

Continue Reading

Tech

NASA’s Artemis II Astronauts Begin Historic Journey Around the Moon After Key Orion Engine Burn

Published

on

Earth's crescent is seen from a solar array camera on the Orion spacecraft on the first flight day of the Artemis II mission. Credit: NASA

CAPE CANAVERAL, Fla. (FNN) — For the first time in more than 50 years, astronauts on a NASA mission are headed around the Moon after successfully completing a critical burn of the Orion spacecraft’s main engine.

The approximately six-minute firing of Orion’s service module engine Thursday — known as the translunar injection burn — accelerated the spacecraft and its crew beyond Earth’s orbit, placing them on a trajectory toward the Moon.

Aboard the spacecraft are NASA astronauts Reid Wiseman, Victor Glover and Christina Koch, along with Canadian Space Agency astronaut Jeremy Hansen.

“Today, for the first time since Apollo 17 in 1972, humans have departed Earth orbit,” said Dr. Lori Glaze, acting associate administrator for NASA’s Exploration Systems Development Mission Directorate. “Reid, Victor, Christina and Jeremy now are on a precise trajectory toward the Moon. Orion is operating with crew for the first time in space, and we are gathering critical data and learning from each step.”

NASA’s Space Launch System rocket and Orion spacecraft lifted off from Launch Pad 39B at Kennedy Space Center at 6:35 p.m. EDT on April 1, beginning a planned 10-day test mission around the Moon and back.

Successful Launch and Spacecraft Activation

Shortly after reaching space, Orion deployed its four solar array wings, allowing the spacecraft to generate power from the Sun. The crew and mission controllers then began transitioning the spacecraft from launch to normal flight operations while checking critical onboard systems.

About 49 minutes into the flight, the rocket’s upper stage fired to place Orion into an elliptical orbit around Earth. A second burn propelled the spacecraft — named “Integrity” by the crew — into a high Earth orbit extending roughly 46,000 miles above the planet for nearly 24 hours of system testing.

Following the maneuver, Orion separated from the upper stage and began flying independently.

System Tests and Crew Operations in Space

During the early phase of the mission, the astronauts conducted a manual piloting demonstration to evaluate Orion’s handling capabilities using the Interim Cryogenic Propulsion Stage as a docking target.

After the test, Orion executed an automated departure burn to safely move away from the stage. The propulsion stage later performed a disposal burn before re-entering Earth’s atmosphere over a remote area of the Pacific Ocean.

Before its re-entry, four small CubeSats were deployed from the rocket’s Orion stage adapter to conduct separate scientific missions.

Mission teams also transitioned communications to NASA’s Deep Space Network while the crew adjusted to the space environment. Astronauts completed their first rest periods, performed onboard exercise routines, restored the spacecraft’s toilet to normal operations and prepared the spacecraft for the translunar injection burn.

Lunar Flyby and Artemis Program Goals

The crew is scheduled to conduct a lunar flyby Monday, April 6, when astronauts will capture high-resolution images and make observations of the Moon’s surface — including portions of the lunar far side rarely seen directly by humans.

Although the far side will only be partially illuminated during the flyby, the lighting conditions are expected to cast long shadows across the terrain, highlighting ridges, slopes and crater rims that are difficult to observe under full sunlight.

After completing the flyby, the astronauts will return to Earth and splash down in the Pacific Ocean off the coast of San Diego.

The mission marks a major milestone for NASA’s Artemis program, which aims to send astronauts on increasingly ambitious missions to explore the Moon, advance scientific discovery, stimulate economic growth and prepare for the first crewed missions to Mars.

Continue Reading
Advertisement
Advertisement Ticket Time Machine ad
Advertisement Orlando Regional REALTOR Association logo
Advertisement Parts Pass App
Advertisement Hispanic Chamber of Commerce of Metro Orlando
Advertisement
Advertisement African American Chamber of Commerce of Central Florida
Advertisement FNN News en Español
Advertisement Indian American Chamber of Commerce logo
Advertisement Florida Sports Channel

FNN Newsletter

Trending